国产精品久久高潮呻吟无码,拷问调教走绳乳夹拉珠小说,乱子真实露脸刺激对白,人人爽人人爽人人片a免费

ACEG’s First Investment in Yangtze River Bridge Project
  |  Updated: 2024-12-25  |  Views: 1115

Recently, ACEG won the S24 Hangzhou to Hefei Expressway Wuhu Taishan Road Yangtze River Bridge and Connection Works, which is ACEG's first investment in Yangtze River bridge project.

With total investment of about RMB15.5 billion Yuan, 48 months of construction period and 356 months of toll-charging period, it has 30.88km of main line and 14.35km of connection line. The starting point crosses with G4231 Nanjing–Jiujiang Expressway and the ending point with G4211 Nanjing–Wuhu Expressway with 4 toll stations and six locations of interconnection along the whole route.

Included in "Layout Planning of Crossing Passages for Yangtze River Trunk Line (2020-2035)", the project can effectively improve the local expressway network and promote economic and social development along the route. Upon completion, it will play an important role in implementing the national strategy of integration of Yangtze River Delta, promoting high-quality development of Yangtze River Economic Belt.

Since 2024, ACEG has focused on high-quality market development, and successively invested in a number of major franchise projects in Anhui province, achieving reasonable growth in quantity and effective improvement in quality, continuously accelerating ACEG’s development featuring transformation, high-quality and large-scale.


主站蜘蛛池模板: 鄢陵县| 墨玉县| 北京市| 四川省| 古交市| 磐安县| 大关县| 承德市| 南投市| 剑河县| 五华县| 自治县| 大渡口区| 涟源市| 灯塔市| 雷波县| 城口县| 文水县| 高碑店市| 景宁| 县级市| 时尚| 卢氏县| 扬中市| 城口县| 兴隆县| 东海县| 平果县| 宕昌县| 依兰县| 龙山县| 舞阳县| 漯河市| 海林市| 吉安市| 乐昌市| 安泽县| 安平县| 镇平县| 如东县| 富蕴县|