国产精品久久高潮呻吟无码,拷问调教走绳乳夹拉珠小说,乱子真实露脸刺激对白,人人爽人人爽人人片a免费

ACEG’s First Investment in Yangtze River Bridge Project
  |  Updated: 2024-12-25  |  Views: 1675

Recently, ACEG won the S24 Hangzhou to Hefei Expressway Wuhu Taishan Road Yangtze River Bridge and Connection Works, which is ACEG's first investment in Yangtze River bridge project.

With total investment of about RMB15.5 billion Yuan, 48 months of construction period and 356 months of toll-charging period, it has 30.88km of main line and 14.35km of connection line. The starting point crosses with G4231 Nanjing–Jiujiang Expressway and the ending point with G4211 Nanjing–Wuhu Expressway with 4 toll stations and six locations of interconnection along the whole route.

Included in "Layout Planning of Crossing Passages for Yangtze River Trunk Line (2020-2035)", the project can effectively improve the local expressway network and promote economic and social development along the route. Upon completion, it will play an important role in implementing the national strategy of integration of Yangtze River Delta, promoting high-quality development of Yangtze River Economic Belt.

Since 2024, ACEG has focused on high-quality market development, and successively invested in a number of major franchise projects in Anhui province, achieving reasonable growth in quantity and effective improvement in quality, continuously accelerating ACEG’s development featuring transformation, high-quality and large-scale.


主站蜘蛛池模板: 佛坪县| 云梦县| 延津县| 宁强县| 方城县| 通化市| 新平| 威信县| 阆中市| 宣恩县| 林西县| 晋宁县| 文水县| 武城县| 米林县| 长海县| 贵溪市| 巴塘县| 曲沃县| 武夷山市| 惠东县| 区。| 肥乡县| 太仆寺旗| 全南县| 辰溪县| 白朗县| 札达县| 大英县| 德钦县| 定日县| 泸州市| 巴青县| 仁化县| 盐源县| 萍乡市| 江源县| 仁化县| 宁海县| 曲阳县| 榕江县|