国产精品久久高潮呻吟无码,拷问调教走绳乳夹拉珠小说,乱子真实露脸刺激对白,人人爽人人爽人人片a免费

Infrastructure Under-construction on PPP Basis – National Highway G206
ACEG Invest.  |  Updated: 2018-01-30  |  Views: 39697

The National Highway G206 Shucheng Section is with a length of 23.1KM starting from the Interchange Overpass named Shuqing in Shucheng County and ending at the boundary with County Tongcheng .

The designed speed is 80km/h for the main road with a width of 24.5m and 60km/h for the urban trunk road with a width of 32m.

The initial shareholder of this project is Tongyun Transportation Construction Investment Co., Ltd. in Shucheng County, accounting for 20% of the shares and the social capital - Anhui Construction Engineering Group Co., Ltd. accounting for 80% of the shares.

The total investment of the project is RMB 840 Million Yuan and the construction cost is RMB 688.5 Million Yuan. The total construction period is 18 months and the operation period is 10 years.

The project commenced in January 2017 and the scheduled completion date will be in July 2018.

 

主站蜘蛛池模板: 富阳市| 河间市| 新郑市| 砚山县| 庄浪县| 江门市| 佛学| 临湘市| 灵石县| 德庆县| 泽州县| 全州县| 隆化县| 会昌县| 柞水县| 容城县| 利津县| 谢通门县| 如皋市| 枝江市| 永胜县| 德江县| 琼中| 宽甸| 昌江| 美姑县| 体育| 阿勒泰市| 定西市| 山丹县| 镇巴县| 海原县| 三原县| 定结县| 永胜县| 合肥市| 九江市| 颍上县| 柳河县| 平陆县| 廉江市|