国产精品久久高潮呻吟无码,拷问调教走绳乳夹拉珠小说,乱子真实露脸刺激对白,人人爽人人爽人人片a免费

Ambassador witnessed the main structure completion of Afghan Embassy Project in Pakistan
ACEG Overseas Co., Ltd.  |  Updated: 2020-12-14  |  Views: 12980
The ceremony for the roof sealing atop the reinforced concrete main structures of Afghan Embassy in Pakistan was held at 1:00 p.m. on December 7 in Islamabad, the capital city of Pakistan.
 
H.E. Mr. Najibullah Alikhil, Afghan Ambassador to Pakistan, and other high-level officials; Chief Supervision Engineer, attended the ceremony.
 
Mr. Pan Zhengqiang, Deputy General Manager of ACEG Pak. Branch, accompanied Mr. Najibullah Alikhil and presided over the great event. With the symbolic completion of the final bucket of concrete poured in place, the Project as a whole has entered into the phase of secondary structural construction, decoration and mechanical and electrical equipment installation.
 
The Project of The Afghan Embassy in Pakistan, locates on the north side of Zhou Enlai Avenue in Islamabad, with a total construction area of 18,834.44 square meters, ACEG Pak. Branch is the contractor. Since September 2018 when the Project commenced, all the staff of the Project have overcome difficulties such as no municipal power supply, lack construction drawings, hot weather and excessive rain in rainy seasons, especially, the COVID-19 epidemic that broke out in early 2020,ACEG Pak. Branch has strictly implemented epidemic prevention and control measures and used chartered airplanes to pick up employees from China. And gridding method was adopted to manage the local staff and finally all the main structures works were completed.
 
Ambassador Najibullah Alikhil addressed the ceremony and congratulated all those present, he noted, the Afghan Embassy in Pakistan has been the largest so far in building areas among Afghan embassies and consulates abroad, ACEG Pak. Branch has risen to the challenge of the epidemic and successfully completed the milestone work of the main structures and this has once again proved that ACEG is a contractor of strength, commitment and prestige.
 
Mr. Pan Zhengqiang said that the successful completion of the main structures marked an important stage victory for the project and laid a solid foundation for the follow-up works, and all the staff of the project are committed to continue to fulfill their duties and live up to the expectations, keep the quality and safety and ensure handing over of the project as scheduled.
 
After the ceremony, Ambassador Najibullah Alikhil visited the construction site accompanied by Mr. Pan and they held a talk on issues of the work plan for the coming phase.
 
 
 

 
 
 
主站蜘蛛池模板: 涪陵区| 兴国县| 南丰县| 固始县| 肥城市| 依安县| 红河县| 昔阳县| 克东县| 新乡县| 沙河市| 琼结县| 扎赉特旗| 阿尔山市| 姜堰市| 丹江口市| 营口市| 肃北| 威信县| 榆树市| 贺兰县| 永定县| 淄博市| 左云县| 锡林郭勒盟| 宁德市| 罗江县| 新蔡县| 楚雄市| 荆门市| 会东县| 武隆县| 穆棱市| 通榆县| 册亨县| 达孜县| 桦川县| 志丹县| 改则县| 揭东县| 武川县|